TBA 500KV Substation


 

Project: TBA 500KV Pleiku 2 Substation
Scope: Supply Telecommnucation for SCADA for 500kV Pleiku2 Substation
Year: 2015
   

 


Bài viết khác

TBA 220KV Thanh Uyen Substation

TBA 220KV Thanh Uyen Substation

Supply Telecommnucation for SCADA for 220kV Than Uyen Substation
Mong Duong II Thermal power plant

Mong Duong II Thermal power plant

Supply communication equipment for Scada System of Mong Duong II Thermal power plant
Nhon Trach 1 Thermal power plant

Nhon Trach 1 Thermal power plant

Supply, installation, Integrated and technical services of Scada Information System Nhon Trach 1 Thermal power plant. (450 MW)
SeSan 3A Hydropower Plant

SeSan 3A Hydropower Plant

Supply, installation, Integrated and technical services of Scada Information System Sesan 3A Hydropower Plant. (108 MW)
Tay Nguyen Wind Farm

Tay Nguyen Wind Farm

Tay Nguyen Wind Farm Project Average wind speed: 7.0 - 7.6 m / s, one of the best wind speed in Vietnam - according to General Electric (GE, USA) and VESTAS (Denmark) * Technology: Turbine GE, type 2.0MW-116m...
Thuong Kontum Hydropower Plant

Thuong Kontum Hydropower Plant

Supply, installation, Integrated and technical services of Scada Information System Thuong Kontum Hydropower Plant. (220 MW)
DAKMI 2 Hydropower Plant

DAKMI 2 Hydropower Plant

Supply, installation, Integrated and technical services of Scada Information System Thuong Kontum Hydropower Plant. (220 MW)
Xekaman 1 Hydro Power Plant (Laos) (290MW)

Xekaman 1 Hydro Power Plant (Laos) (290MW)

Supply, installation, Integrated and technical services of Scada Information System Xekaman 1 Hydropower Plant (Laos) (290MW)