Tay Nguyen Wind Farm
Tay Nguyen Wind Farm Project
Average wind speed: 7.0 - 7.6 m / s, one of the best wind speed in Vietnam - according to General Electric (GE, USA) and VESTAS (Denmark)
* Technology: Turbine GE, type 2.0MW-116m / 80mHH (turbine type with capacity 2 Mega-Watt, diameter 116m wing, mounted on tower 80m high)
Project: |
Tay Nguyen farm wind |
Hạng mục: |
Supply, installation, Integrated and technical services of Scada Information |
Năm: |
2018 |
|
|
Supply Telecommnucation for SCADA for 220kV Than Uyen Substation
Supply communication equipment for Scada System of Mong Duong II Thermal power plant
Supply, installation, Integrated and technical services of Scada Information System Nhon Trach 1 Thermal power plant. (450 MW)
Supply, installation, Integrated and technical services of Scada Information System Sesan 3A Hydropower Plant. (108 MW)
Supply Telecommnucation for SCADA for 500kV Pleiku2 Substation Station
Supply, installation, Integrated and technical services of Scada Information System Thuong Kontum Hydropower Plant. (220 MW)
Supply, installation, Integrated and technical services of Scada Information System Thuong Kontum Hydropower Plant. (220 MW)
Supply, installation, Integrated and technical services of Scada Information System Xekaman 1 Hydropower Plant (Laos) (290MW)